17th Bunker damaged by heavy rain before bunker dry installation
17th Greenside bunker at Asquith Golf Club NSW
EXCAVATING AT THE BOTTOM OF THE BUNKER, LOWEST POINT
EXCAVATING TRENCH FOR CARRIER PIPE
EXCAVATING BEYOND BUNKER TO DISCHARGE BELOW BASE OF BUNKER
TEST FIT BUNKER DRY DEVICE
DRILL Ø52mm HOLE IN Ø100mm PVC CARRIER PIPE
INSTALL PRIMARY WEIR COMPONENT AND CARRIER PIPE INTO TRENCH
VIEW LOOKING SOUTH
INSTALL CARRIER PIPE INTO TRENCH
WATER FOUND IN BASE OF BUNKER. EXISTING SUB SOIL PIPE HAD FAILED